Projects

Factory Deep Water Well — Bekasi

120 m deep water well delivering 3 L/s for utility needs of a manufacturing plant in Cikarang.

Factory Deep Water Well — Bekasi

Project Summary

A 120 m deep water well for a manufacturing plant in Cikarang, Bekasi. Pumping test confirmed 3 L/s yield with water quality meeting industrial standards.

Scope

  • 1-point geoelectric survey
  • 120 m drilling with 8″ casing
  • 48-hour continuous pumping test
  • Accredited lab water quality test
  • 7.5 kW submersible pump installation